ENVIRONMENTAL MONITORING

İzmir Natural Gas Combined Cycle Power Plant (NGCCPP)
(ENKA)
Consultancy Services for Environmental Permits and Audits (2011 - Ongoing)

Adapazarı NGCCPP
(ENKA)
Consultancy Services for Environmental Permits and Audits (2011 - Ongoing)

Gebze NGCCPP
(ENKA)
Consultancy Services for Environmental Permits and Audits (2011 - Ongoing)

Arkun Dam and Hydroelectric Power Plant (HEPP)
(ENERJİSA)
Construction Period Environmental Monitoring Study (2011 - Ongoing)

Kırıkkale NGCCPP
(ÇALIK)
Construction Period Environmental Monitoring Study (2011 - Ongoing)

Doğançay Weir and HEPP
(ENERJİSA)
Construction Period Environmental Monitoring Study (2011 - Ongoing)

Yamanlı-II HEPP and Quarries
(ENERJİSA)
Construction Period Environmental Monitoring Study (2011 - Ongoing)

AYAS Power Plant Project
(AYAS)
Construction Period Environmental Monitoring Study (2010 - Ongoing)

Kavşak Bendi HEPPCapacityIncrease
(ENERJISA)
Construction Period Environmental Monitoring Study (2010 - Ongoing)

Köprü Dam, HEPP and Quarries
(ENERJİSA)
Construction Period Environmental Monitoring Study (2010 - Ongoing)

Menge Dam, HEPP and Quarries
(ENERJİSA)
Construction Period Environmental Monitoring Study (2010 - Ongoing)

Hatay Airport
(DHMİ)
Bird Monitoring Study (2010 - Ongoing)

Cevizlik Weir and HEPP
(SANKO)
Operational Period Environmental Monitoring Study (2010 - Ongoing)
Construction Period Environmental Monitoring Study (2008 - 2010)

Bahçe Wind Power Plant (WPP) (Project supported by IFC, EBRD and Dexia)
(ZORLU)
Operational Period Environmental Monitoring Study (2010 - Ongoing)
Construction Period Environmental Monitoring Study (2009 - 2010)

Seyhan-Ceyhan Basin ENERJISA Projects
(ENERJİSA)
Fish Fauna Monitoring Studies (2009 - Ongoing)

Mersin NGCCPP
(AKFEN)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

Akköy-II HEPP
(KOLİN)
Construction Period Environmental Monitoring Study (2009 - Ongoing)

Kalkandere Weir and HEPP
(SANKO)
Construction Period Environmental Monitoring Study (2009 - Ongoing)

Balabanlı WPP
(RES Anatolia Holding)
Construction Period Environmental Monitoring Study (2009 - Ongoing)

Tufanbeyli Power Plant Project
(ENERJİSA)
Pre-construction, Construction and Operational Period Environmental Monitoring Studies (2007 - Ongoing)

Yedigöze Sanibey Dam HEPP and Quarries Project
(SANKO)
Construction Period Environmental Monitoring Study (2007 - Ongoing)

Sugözü Power Plant Project
(İSKEN)
Operational Period Environmental Monitoring Study (2005 - Ongoing)

Ankara NGCCPP
(BAYMİNA)
Stack Gas Emission, Air Quality, Water Quality and Noise Measurement Monitoring Studies (2005 - Ongoing)

Kars Solid Waste Landfill
(Kars Municipality)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2005 - Ongoing)

İskenderun Energy Plant
(İSKEN)
Preparation of Assessment Report on Agricultural Monitoring Studies (2010)

Bandırma-I NGCCPP
(ENERJİSA)
Environmental Monitoring in accordance with the Environmental Management Plan for the 380 kV Energy Transmission Line (2009 - 2010)

Bandırma-I NGCCPP
(ENERJİSA)
Construction Period Environmental Monitoring Study (2008 - 2010)

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline (Project supported by IFC and EBRD)
(BOTAŞ International Ltd.)
Operational Period Environmental Monitoring Studies (Wastewater and Surface Water Monitoring Study, Air Quality Monitoring Study, Emission Monitoring Study), (2006 - 2010)

INVESTMENT MONITORING

Doğançay Weir and HEPP
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2011 - Ongoing)

Kırıkkale NGCCPP
(ÇALIK)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2010 - Ongoing)

800 MW Aliağa Power Plant
(ENKA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2010 - Ongoing)

Kavşak Bendi HEPP Capacity Increase
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2010 - Ongoing)

Mersin NGCCPP
(AKFEN)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2010 - Ongoing)

Balabanlı WPP
(RES Anatolia Holding)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

Köprü Dam, HEPP and Quarries
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

Menge Dam, HEPP and Quarries
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

Yamanlı-II HEPP and Quarries
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

2011 Winter Olympics
(General Directorate of Youth and Sports)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2009 - Ongoing)

AYAS Power Plant
(AYAS)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2008 - Ongoing)

Extension of Ferry Dock of Marmaris Port
(MARMARİS PORT ENTERPRISES)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2007 - Ongoing)

Ceyhan Refinery and Petrochemical Complex
(ÇALIK)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2007 - Ongoing)

Yedigöze Sanibey Dam, HEPP and Quarries
(SANKO)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2007 - Ongoing)

Kalkandere Weir and HEPP
(SANKO)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2007 - Ongoing)

Kars Livestock Organized Industrial Zone (OIZ)
(Chairmanship of Kars Livestock OIZ Enterprising Committee)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2007 - Ongoing)

Tufanbeyli Power Plant
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2006 - Ongoing)

Kayseri Solid Waste Landfill
(ALATEC- Kayseri Metropolitan Municipality)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2006 - Ongoing)

Iğdır Solid Waste Landfill
(Iğdır Municipality)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2006 - Ongoing)

Ankara-Konya Railway (Polatlı-Konya Section)
(General Directorate of Turkish State Railways)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2006 - Ongoing)

Kars Solid Waste Landfill
(Kars Municipality)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2005 - Ongoing)

Bandırma-I NGCCPP
(ENERJİSA)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2008 - 2010)

Cevizlik Weir and HEPP
(SANKO)
Preparation of Monitoring-Control Form for the Construction Period in accordance with the commitments given in the EIA Report (2006 - 2010)

ENVIRONMENTAL DUE DILIGENCE (EDD)

Yenice Well Site
(Coca-Cola İçecek "CCİ")
Phase-I EDD Study (2011)

Kura-Çoruh Derivation Energy System Projects
(BORUSAN)
Phase-I EDD Study (2011)

Yüce, Akpınar, Akıncı and Çaykara HEPP's
(INPSA)
Phase-I EDD Study (2011)

Çankaya HEPP
(BORUSAN)
Phase-I EDD Study (2010 - 2011)

Ankara Coca Cola (CCi)
(TCCC)
Phase-I EDD Study (2010)

Adidas Çorlu and Konya Manufacturing Facilities
(WSP CONSULTANTS)
Phase-1 EDD Study (2008)

Bandırma Offshore Plant
(GMR)
Phase-I EDD Study (2008)

BVT 30
(BOTAŞ International Ltd.)
Phase-II EDD Study (2008)

İÇDAŞ Çanakkale Shipyard and Utilities
(SUEZ-TRACTEBEL)
Phase-I EDD Study (2007)

WR Grace Tuzla Construction Products Plant
(DELTA)
Phase-I HSE Compliance Audit (2007)

Çambel WPP
(ERM)
Phase-I EDD Study (2007)

Suez Tractabel İçdaş Shipyard and Utilities
(BAYMİNA)
EDD Study (Review of EIA Report) (2007)

Ayvalık Tourism Investment
(DEREN LAW OFFICE)
Phase-II EDD Study (2007)

Privatization of PETKIM
(ÇALIK)
Data Room Study (2007)

Taq Taq and Kewa Chirmila Oil Fields (Northern Iraq)
(GENEL ENERJİ and ADDAX)
Phase-I and Phase-II EDD Studies (2005 - 2007)

Potential Social Facility Site
(GOODYEAR)
Phase-I EDD Study (2006)

İzmit Social Facility Site
(GOODYEAR)
Phase-I EDD Study (2006)

Bina Bawi Oil Field (Northern Iraq)
(PETOIL)
Phase-I and Phase-II EDD Studies (2006)

İzmit, Bursa, İzmir and Ankara Karbogaz Plants
(KARBOGAZ)
Phase-I EDD Study (2005)

İstanbul FAKOPharmaceutical Company
(FAKO ACTAVIS)
Phase-I EDD Study (2005)

ECOLOGICAL MONITORING AND ASSESSMENT STUDIES (TERRESTRIAL, AQUATIC AND MARINE ECOLOGY ASSESSMENT AND MONITORING STUDIES)

Doğançay Weir and HEPP
(ENERJİSA)
Fish Fauna Monitoring Study (2011 - Ongoing)

Ceyhan Refinery and Petrochemical Complex
(ÇALIK)
Terrestrial and Marine Ecology Study (2011 - Ongoing)

Aksu HEPP
(ÇALIK)
Preparation of Ecosystem Assessment Report (Terrestrial Ecology, Aquatic Ecology (Fish Fauna) and Hydrogeology Monitoring) (2011 - Ongoing)

Fatsa HEPP
(STUCKY)
Preparation of Ecosystem Assessment Report (Terrestrial Ecology, Aquatic Ecology (Fish Fauna) and Hydrogeology Monitoring) (2011 - Ongoing)

Yalnızardıç HEPP
(KOLİN)
Ecological Monitoring Study (Terrestrial Ecology, Aquatic Ecology (Fish Fauna)) (2011 - Ongoing)

HEPP's on Seyhan-Ceyhan Basin
(ENERJİSA)
Fish Fauna Monitoring Study (2009 - Ongoing)

Nabucco Natural Gas Pipeline Project (West Section)
(NIC (SU-YAPI))
Ecological Monitoring Study
Terrestrial Ecology- Mammals, Birds, Reptiles, Amphibians, Terrestrial Invertebrates
Aquatic Ecology- Fish, Aquatic Invertebrates, Marine Ecology
(2009 - Ongoing)

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline
(BOTAŞ International Ltd.)
Marine Sediment Monitoring Study, Marine Water Quality and Biota Monitoring Study (2006 - Ongoing)

Hatay Airport
(DHMİ)
Bird Monitoring Studies (2005, 2010, 2011)

Gerze Power Plant
(ANADOLU GROUP)
Marine Ecology Study (2011)

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline
(BOTAŞ International Ltd.)
Physical Monitoring Study, Ecological Monitoring Study, Marine Turtle Monitoring Study (2006 - 2010)

KICE Pipeline (Northern Iraq)
(TTOPCO)
Terrestrial Ecology Study (2010)

Aksu Dam and HEPP
(ÇALIK)
Assessment of Impacts of Aksu Dam and HEPP on İspir Verçenik Wildlife Development Area (2010)

Tuzgölü Underground Natural Gas Storage Facility
(ÇALIK)
Ecological Monitoring Study (2010)

Fish Farms
(TÜBİTAK)
Identification of Benthic Organisms (2009)

Sugözü Power Plant
(İSKEN)
Seasonal Marine Ecology Monitoring Study (2009)

Boreas WPP
(BOREAS)
Bird Monitoring Study (2009)

Yamanlı-II Weir and HEPP
(ENERJİSA)
Ecological Monitoring Study (2008)

Bandırma NGCCPP
(ENERJİSA)
Marine Ecology Study (2008)

Meriç River
(CFCU)
Bird Monitoring Study (2008)

Adıyaman Gölbaşı Power Plant
(ENSR)
Flora-Fauna Study (2007)

ENVIRONMENTAL AUDITS, PERMITS AND LICENCES

Yenikent Packaging Factory
(ASAŞ)
Environmental Permits and Auditing (2010 - Ongoing)

Sugözü Power Plant
(İSKEN)
Analyses of Discharge Permit (2008 - Ongoing)
Application for Emission Permit (2008)

Nallıhan Wastewater Treatment Plant
(HELVALI)
Application for Discharge Permit (2010)

Poultry Research Institute, Ikizce Plants
(Poultry Research Institute)
Application for Emission Permit (2010)

Ankara-İstanbul High-Speed Train Project (Project supported by the EIB)
(KOCKS CONSULT)
Construction Period Environmental Audit (2009 - 2010)

Yedigoze Sanibey Dam and HEPP
(SANKO)
Annual Environmental and Social Auditing (2008 - 2010)

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline
(BOTAŞ International Ltd.)
Application for Emission Permit (2008)

Çayırhan Mining Sites
(PARK TERMİK)
Approval of the G sector Wastewater Treatment Plant Project (2008)

VeterinerPharmaceutical Company
(VİLSAN)
Application for Emission Permit (2008)

Hereke and Tavşancıl Power Plants
(NUH)
Application for Business and Work Licenses (2008)
Application for Emission and Discharge Permits (2006)

Ankara-Eskişehir High-Speed Train Project
(OHL-ALSİM-ALARKO-G&O)
Preparation of Backdated Environmental Assessment Report (2006)

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline- Assessment of Community Investment Programme
(BOTAŞ International Ltd.)
Assessment of Environmental Impacts (2006)

Sun Marina
(ALKOR)
Application for Construction Permits (2006)

ETİ Bakır Samsun Facility
(CENGİZ GROUP)
Application for Emission Permit (2005)

50 MW Van Diesel Power Plant
(ENER)
Application for Emission Permit (2005)

ARCHAEOLOGICAL STUDIES

Ceyhan Refinery and Petrochemical Complex
(ÇALIK)
Archaeology Study (2011 - Ongoing)

Nabucco Natural Gas Pipeline Project (West Section)
(NIC (SU-YAPI))
Archaeology Study (2009 - Ongoing)

Çankaya-I;and Çankaya-II HEPPs
(BORUSAN)
Archaeology Study (2011)

Gerze Power Plant
(ANADOLU GROUP)
Archaeology Study (2011)

Osmaniye Cement Factory
(ESSENTIUM GROUP)
Archaeology Study (2011)

Sedef Power Plant
(İPEKYOLU)
Archaeology Study (2011)

KICE Pipeline (Northern Iraq)
(TTOPCO)
Archaeology Study (2010)

Gölovası Power Plant Site
(MİMAG-SAMKO-SUEZ)
Archaeology Study (2009)

Köprü Dam and HEPP, Menge Dam and HEPP
(ENERJİSA)
Cultural Heritage Study (2008)

Ayas Power Plant
(İSKEN)
Archaeology Study (2008)